Glossary and statuses
The application is in Dutch. This page gives the translation of the terms you will see most often and explains each status.
Common terms
Section titled “Common terms”| In the application | In English |
|---|---|
| Interventie | intervention (work order at a customer’s premises) |
| Klant | customer |
| Locatie | site, a customer’s intervention address |
| Installatie | installation, device tracked at the customer’s premises |
| Technieker | technician |
| Bestelwagen, bus | the technician’s van |
| Busvoorraad | van stock |
| Magazijn | warehouse |
| Onderdeel, artikel | part, item |
| Paraatheid | parts readiness before departure |
| Aanvulverzoek | replenishment request (van) |
| Overboeking | stock transfer |
| Onderhoudscontract | maintenance contract |
| Offerte | quote |
| Bestelbon | sales order (confirmed quote) |
| Factuur, creditnota | invoice, credit note |
| Rapport | intervention report |
| Handtekening | signature |
| LMRA | last-minute risk analysis, carried out on site before the work |
| PBM | personal protective equipment (PPE) |
| Afwijking | non-conformity |
| QR-melding | report sent using an installation’s QR code |
| Storing | breakdown |
| Stilstand, buiten werking | downtime, out of service |
| Instellingen, Configuratie | settings, configuration |
| Opslaan, Bewaren | save |
| Annuleren | cancel |
| Wijzigen | edit |
| Archiveren, Terugzetten | archive, restore |
Status of an intervention (office)
Section titled “Status of an intervention (office)”| Status | Meaning | Group |
|---|---|---|
| Nieuw | created, not yet scheduled | to schedule |
| Gepland | date planned | scheduled |
| Toegewezen | a technician is assigned | scheduled |
| Onderweg | the technician is on the way | in the field |
| Ter plaatse | the technician has arrived | in the field |
| In uitvoering | the work has started | in the field |
| Te herplannen | to reschedule (customer absent, partial work…) | to handle |
| Wacht op onderdelen | waiting for parts | to handle |
| Opvolging vereist | a follow-up is needed | to handle |
| Voltooid | completed | closed |
| Geannuleerd | cancelled | closed |
Priority
Section titled “Priority”| Priority | Default response time |
|---|---|
| Normaal | 72 h |
| Belangrijk | 48 h |
| Dringend | 24 h |
| Kritiek | 8 h |
The response times are those of your company; they set the deadline shown on the intervention.
Closing outcome
Section titled “Closing outcome”| In the office | In the technician app | What next |
|---|---|---|
| Volledig voltooid | Volledig afgewerkt | the intervention is closed |
| Gedeeltelijk voltooid | Gedeeltelijk afgewerkt | it goes back to Te herplannen |
| Onderdelen ontbreken | Wacht op onderdelen | it changes to Wacht op onderdelen |
| Opvolging vereist | Opvolging nodig | it changes to Opvolging vereist |
| Klant afwezig | Klant afwezig | it goes back to Te herplannen |
Status of the technician on an intervention
Section titled “Status of the technician on an intervention”The office and the technician app do not use quite the same words for the same step:
| In the office | In the technician app |
|---|---|
| Nog niet gestart | Gepland |
| Onderweg | Onderweg |
| Ter plaatse | Ter plaatse |
| Aan het werk | Bezig |
| Gepauzeerd | Gepauzeerd |
| Afgewerkt | Afgerond |
| Klant afwezig | Klant afwezig |
| Geannuleerd | Geannuleerd |
Customer signature
Section titled “Customer signature”| Status | Meaning |
|---|---|
| Handtekening open | not signed yet |
| Getekend | signed |
| Klant niet beschikbaar (office) / Klant niet aanwezig (technician app) | the customer was not there to sign (explanation required) |
| Klant weigerde (office) / Klant weigert te tekenen (technician app) | the customer refused to sign (explanation required) |
Parts readiness (Paraatheid)
Section titled “Parts readiness (Paraatheid)”| Status | Meaning |
|---|---|
| Klaar | everything needed is in the van |
| Risico | the parts exist, but not all in the planned van (another van, the warehouse, partial quantity) |
| Onderdelen ontbreken | one or more parts are missing |
| Geblokkeerd | the intervention cannot go ahead without action (part not found, no vehicle…) |
| Geen gegevens | no template or history makes it possible to say which parts are needed |
Health of an installation (Gezondheid)
Section titled “Health of an installation (Gezondheid)”| Status | Meaning |
|---|---|
| Uitstekend | score 85 and above |
| Goed | score 70 and above |
| Aandacht | score 50 and above |
| Kritiek | score below 50 |
| Onvoldoende data | not enough information for a score |
| Buiten werking | currently stopped; this status takes precedence over the score |
The score is calculated with fixed rules based on what has been recorded (breakdowns, downtime, overdue maintenance, costs). It is not a prediction.
Other statuses
Section titled “Other statuses”| Topic | Values |
|---|---|
| Warranty | Garantie geldig, Garantie verloopt (within 30 days), Garantie verlopen, Geen garantiedatum |
| Maintenance of an installation | Op schema, Binnenkort (within 14 days), Achterstallig, Niet gepland |
| Maintenance contract | Achterstallig (visit overdue), Binnen 30 dagen (visit within 30 days) |
| Stock | Op voorraad, Onder minimum, Uitverkocht |
| Invoice | Concept, Open, Deels betaald, In betaling, Betaald, Vervallen, Creditnota, Geannuleerd |